Cascade 2 (CAS2) is a 450 MW natural gas combined cycle generator located in Yellowhead County, approximately 12 KM southwest of Edson, AB. This asset is located at the same facility as Cascade 1, which together cost ~$1.5B to build, and was connected to the grid in 2023. The facility is comprised of two Siemens SCC6-8000H gas turbines for a combined generation capacity of 900 MW. These turbines are designed for short start-up and ramp times which will help ensure a stable power grid in Alberta.
This asset is owned by Kineticor.
info