Wind

Castle River #1 (CR1)

·

Wind

Castle River #1 (CR1)

·

Castle River #1 (CR1) is a wind facility with a maximum capability of 39 MW. It is owned and operated by TransAlta. It consists of three phases:

Phase 1 was commissioned in 1997. It includes one Vestas V44/600 wind turbine. 

Phase 2 was commissioned in 2001. It includes 15 Vestas V47/660 wind turbines.

Phase 3 was commisisoned in 2001. It includes 44 Vestas V47/660 wind turbines.

 

info
%

Capacity Factor

%

Current Generation

speed