Cypress 1 (CYP1) is a 196 MW wind asset comprised 39 of Siemens-Gamesa SG145 turbines, capable of up to between 5 and 5.2 MW each. Along with its sister asset CYP2, it's located approximately 20 km southeast of the hamlet of Dumore in Cypress County, AB. It was one of the projects that was part of the Renewable Energy Program (REP) Round 2 contracts.
This project is a partnership between EDF Renewables Canada Inc. and Kainai Nation (Blood Tribe).
info