Halkirk 2 (HAL2) is a 126 MW wind farm located on privately owned land about 5 km north of Halkirk 1 in the County of Paintearth.
This asset is comprised of 31 Vestas V150-4.5 turbines and owned by Capital Power.
info
Halkirk 2 (HAL2) is a 126 MW wind farm located on privately owned land about 5 km north of Halkirk 1 in the County of Paintearth.
This asset is comprised of 31 Vestas V150-4.5 turbines and owned by Capital Power.
Capacity Factor
Current Generation