Enmax Taber (TAB1) was commissioned in 2009; it is owned and operated by ENMAX. At this wind facility, 37 Enercon E70/2300 wind turbines provide a maximum capability of 81 MW.
info
Enmax Taber (TAB1) was commissioned in 2009; it is owned and operated by ENMAX. At this wind facility, 37 Enercon E70/2300 wind turbines provide a maximum capability of 81 MW.
Capacity Factor
Current Generation