Wind

Whitla (WHT1)

·

Wind

Whitla (WHT1)

·

Whitla (WHT1) is a wind generation asset owned by Capital Power that began construction in September 2018 and went online a year later.  It is one of the largest wind power generation assets in Alberta at a maximum capability of 202 MW.

The first phase of the project installed 56 Vesta V136 wind turbines at a cost of $325 million.  It was later expanded to with the Whitla 2 asset.

info
%

Capacity Factor

%

Current Generation

speed