Cloverbar #3 (ENC3) is a gas-fired peaking unit located on the northeast side of Edmonton, Alberta. It is owned by Capital Power (CBEC) L.P. and it has a maximum capability of 101 MW.
Cloverbar #1 (ENC1), Cloverbar #2 (ENC2), and Cloverbar #3 (ENC3) are separate assets located at the same facility. Unit 1 was commissioned in 2008. Units 2 and 3 were commissioned in 2009.
info